Majority Aboriginal-Owned Civil Contractor | Pilbara, WA
Home » Services » Civil Construction » Infrastructure Construction » Piling Cap Construction
Civil Construction Services
Professional piling cap construction contractors in WA. Servicing metro and regional areas including Perth, Karratha, the Pilbara and the South West.
Gajawari KW constructs in-situ piling caps for structural foundations across infrastructure, transport, and industrial projects in Western Australia.
All caps are built to engineering spec with precise formwork, reinforcement placement, and controlled pours over driven or bored piles.
We form and pour pile caps directly on site, managing excavation, shuttering, and concrete placement to match engineering requirements. Formwork systems are configured to ensure dimensional stability and anchor alignment. Pour sequencing is planned to control curing, minimise cold joints, and maintain structural integrity across the full base area.
We construct large-scale pile cap systems spanning multiple piles with tight tolerances on load distribution and alignment. Reinforcement cages are fabricated and positioned to design spec, with pile top trimming and breakback handled to ensure clean interfaces. Pour schedules account for volume, access constraints, and curing windows.
Steel reinforcement is cut, bent, and installed to match bar schedules and lap lengths. Fixing is conducted with on-site verification to ensure clear cover, bar spacing, and anchor embedment. Tolerances are maintained to prevent clash with post-installed elements or structural conflicts during vertical build.
We deliver poured concrete footings and slabs integrated with pile caps, enabling rapid transition from substructure to superstructure. Foundation pours are coordinated with embedded services and inserts, ensuring readiness for structural steel or precast follow-on works. All pours are quality tested for slump, strength, and finish.
We conduct precise bulk and detailed excavation for pile caps, maintaining cut levels and stability throughout footing zones. Subgrade compaction and blinding layers are applied to spec, with dewatering and edge protection managed as required. Excavation works are staged to support reinforcement and formwork without delay.
Related